Searching out for the frequently asked agile scrum interview questions that could help you ace the interview? You’re at the right place as here we’ve covered top agile scrum interview questions and answers.
Agile Scrum is the best methodology to meet today’s demand for accurate projects. Agile is used in almost the majority of the organizations by now. Each member of the agile and scrum team is responsible to play an important role in the organization. For this, the interviewer seeks candidates with some good knowledge of Agile and Scrum concepts. So, it becomes essential to prepare yourself for some common and frequently asked Agile Scrum interview questions.
Currently, there are plenty of openings in the area of agile in the IT market and people are going through the interview process for the same. As the boundaries of agile are unlimited due to vast coverage and multiple flavors, it becomes difficult for aspirants to prepare for the interviews.
In this article, we shall focus on the different areas under which interview questions on agile scrum are asked and what are the commonly asked questions for agile scrum interviews.
Agile Scrum Interview Questions
Here, we represent top 40 Agile Scrum interview questions with answers and hope that these questions will help you while preparing for the agile scrum interview.
Basic Agile Scrum Interview Questions
While you are preparing for the Agile Scrum interview, move to your final preparation with the below-mentioned basic agile scrum interview questions. These are quick questions you should go through before your agile scrum interview.
1. What is the duration of a scrum sprint?
Answer: Generally, the duration of a scrum sprint (scrum cycle) depends upon the size of project and team working on it. The team size may vary from 3-9 members. In general, a scrum script complete in 3-4 weeks. Thus, on an average, the duration of a scrum sprint (scrum cycle) is 4 weeks. This type of sprint-based Agile scrum interview questions is very common in an agile or scrum master interview.
2. What is Velocity?
Answer: Velocity question is generally posed to understand if you have done some real work and familiar with the term. Its definition “Velocity is the rate at which team progresses print by sprint” should be enough. You can also add saying the important feature of velocity that it can’t be compared to two different scrum teams.
3. What do you know about impediments in Scrum? Give some examples of impediments.
Answer: Impediments are the obstacles or issues faced by scrum team which slow down their speed of work. If something is trying to block the scrum team from their getting work “Done” then it is an impediment. Impediments can come in any form. Some of the impediments are given as –
- Resource missing or sick team member
- Technical, operational, organizational problems
- Lack of management supportive system
- Business problems
- External issues such as weather, war etc
- Lack of skill or knowledge
While answering impediments related agile scrum interview questions remember that you may be asked the way to remove any of the mentioned impediment.
4. What is the difference and similarity between Agile and Scrum?
Answer: Difference between Agile and Scrum – Agile is a broad spectrum, it is a methodology used for project management while Scrum is just a form of the Agile that describes the process and its steps more concisely. Agile is a practice whereas scrum is a procedure to pursue this practice.
The similarity between Agile and Scrum – The Agile involves completing projects in steps or incrementally. The Agile methodology is considered to be iterative in nature. Being a form of Agile, Scrum is same as that of the Agile. It is also incremental and iterative.
5. What is the increment? Explain.
Answer: This is one of the commonly asked agile scrum interview questions and a quick answer can be given this way. An increment is the total of all the product backlogs items completed during a sprint. Each increment includes all the previous sprint increment values as it is cumulative. It must be in the available mode in the subsequent release as it is a step to reach your goal.
6. What is the “build-breaker”?
Answer: The build-breaker is a situation that arises when there is a bug in the software. Due to this sudden unexpected bug, compilation process stops or execution fails or a warning is generated. The responsibility of the tester is then to get the software back to the normal working stage removing the bug.
7. What do you understand by Daily Stand-Up?
Answer: You may surely get an interview question about daily stand-up. So, what should be the answer to this question? The daily stand-up is an everyday meeting (most preferably held in the morning) in which the whole team meets for almost 15 minutes to find answer to the following three questions –
- What was done yesterday?
- What is your plan for today?
- Is there any impediment or block that restricts you from completing your task?
The daily stand-up is an effective way to motivate the team and make them set a goal for the day.
8. What do you know about Scrum ban?
Answer: Scrum-ban is a Scrum and Kanban-based model for the software development. This model is specifically used for the projects that need continuous maintenance, have various programming errors or have some sudden changes. This model promotes the completion of a project in minimum time for a programming error or user story.
Agile Interview Questions
In this section, we are going to cover Agile interview questions. You should be prepared for the agile interview with the following agile interview questions.
9. State some of the Agile quality strategies.
Answer: Some of the Agile quality strategies are –
- Iteration
- Re-factoring
- Dynamic code analysis
- Short feedback cycles
- Reviews and inspection
- Standards and guidelines
- Milestone reviews
Preparing for PMI-ACP certification? Know your current level of preparation with PMI-ACP Free Test.
10. Do you know about Agile Manifesto & its Principles? Explain in brief.
Answer: This is the theory which most of agile/scrum roles aspirant should be on tips. Four manifesto values and 12 principles should be explained as much as possible as part of this question. Even if it’s not explained in 100% accurate manner it should be fine but intentions of values and principles should come out e.g.
- Working Software should be demonstrated at regular intervals
- Individuals & interaction – self-organization, self-motivating should be encouraged
- Customer collaboration
- Welcoming change at any point in time in the project
11. Is there any drawback of the Agile model? If yes, explain.
Answer: Yes, there are some drawbacks of the Agile model, some of them are as follows –
- It is not easy to make a prediction about the effort required to complete a task. It becomes more problematic in case of large projects as it becomes difficult to get an idea of the total effort required.
- At sometimes, it’s not possible to properly focus on the design and documentation of the project
- In case the requirements of the client are not understood properly, the final project will not meet the customer requirements. Thus, it will lead to the customer dissatisfaction.
- Only the leader who has considerable experience in Agile methodologies is capable to take important decisions. The team members with little or no experience are not involved in decision-making, thus they don’t get chance to advance their knowledge.
It’s not always the case that you will be asked the questions about the characteristics and advantages of the agile and scrum in an agile scrum interview. So, just prepare yourself for the drawbacks and disadvantages related agile scrum interview questions.
12. What is the use of burn-up and burn-down charts?
Answer: The burn-up chart illustrates the amount of completed work in a project whereas the burn-down chart depicts the amount of work remained to complete a project. Thus, the burn-up and burn-down charts are used to trace the progress of a project.
13. Define Zero Sprint and Spike in Agile.
Answer: To answer this question, describe Zero Sprint and Agile in detail, as follows –
Zero sprint – Zero Sprint can be defined as the preparation step of the first sprint in Agile. There are some activities that are required to be done before actually starting the project. These activities are considered as the Zero sprint; the examples of such activities are – setting the environment for development, preparation of backlogs etc.
Spike – Spike is the type of story that can be taken between the sprints. Spikes are commonly used for the activities related to the design or technical issues such as research, design, prototyping, and exploration. There are two types of spikes – functional spikes and technical spikes.
Scrum Interview Questions
While going for a scrum job interview, prepare yourself for some good scrum interview questions. You may be asked questions related to scrum master, sprint, story point, sashimi, ceremonies etc. by the interviewer. So, prepare yourself for these scrum interview questions.
14. What is the role of the Scrum Master?
Answer: Here’s how you can answer Scrum Master interview questions like this –
The scrum master is the leader as well as coach of the Scrum team. The scrum master is responsible to serve and protect his team from any kind of distractions that could affect their performance. The main role of the scrum master is to motivate his team to achieve the sprint goal. He is focused to build a self-organized and motivated team where each member is familiar with the implementation of Agile and Scrum principles and applications. The scrum master keeps a proper check on the scrum team if they are executing committed tasks properly. He is also responsible to increase the efficiency and productivity of the team so that they can achieve the sprint goal effectively.
Also Read : Scrum – Is it mandatory to learn in today’s IT market?
15. What do you know about a story point in Scrum?
Answer: A story point in Scrum is the unit for the estimation of total efforts that are required to perform or complete a particular task. So, here is how you can answer such agile scrum interview questions on a single line.
16. What is the role of Sashimi in Scrum methodology?
Answer: Sashimi plays an important role in Scrum methodology. Sashimi is a technique used by Scrum to check the completion of all the functions created by the developers. Using this technique, all the requirements such as analysis, designing, coding, testing and documentation that are used in the constitution of a product are checked and only after that the product is displayed.
17. What are the different roles in Scrum?
The three scrum roles i.e. Scrum Master, Product Owner and Team should be explained with the details of few primary responsibilities of each role. You can add more details as mentioned below for a particular depending on the role you are getting interviewed for.
Product owner – A product owner is actually the stakeholder of the project. He represents the project requirements before the team. He is responsible to have a vision of what to build and convey his detailed vision to the team. He is the starting point of an agile scrum software development project.
Scrum team – Scrum team is formed by the collective contribution of individuals who perform for the accomplishment of a particular project. The team is bound to work for the timely delivery of the requested product.
Scrum master – Scrum master is the leader and the coach for the scrum team who checks whether the scrum team is executing committed tasks properly. He is also responsible to increase the efficiency and productivity of the team so that they can achieve the sprint goal effectively.
18. What are the responsibilities of a Scrum Master?
Answer: Key responsibilities of a Scrum Master involves:
- Tracking and monitoring
- Understanding requirements properly
- Work to reach the project goal
- Process checking master and quality master
- Protect the team from detachments
- Improving the performance of the team
- Lead the meetings and resolve issues
- Resolution of conflicts and impediments
- Communication and reporting
Read Here : What are Scrum roles and why it’s needed?
19. What are different ceremonies and their importance in Scrum?
- Scrum planning, Scrum – Daily stand up, Scrum review & scrum retrospective ceremonies should be clearly expressed with the purpose of the ceremony. It’s important to remember the time-boxing of the ceremonies for a standard 4 weeks of Sprint or as per the Sprint you have used in your projects.
Agile Testing Interview Questions
Agile testing is the software development practice using practices of agile software development. In an interview for the Agile job, you may be asked agile testing questions, so have a look at the agile testing interview questions.
20. What do you understand by the term Agile testing?
Answer: Agile testing is a software testing practice that is fully based on the agile principles of software development. It is an iterative methodology where the requirements are the outcome of collaboration between the product owner and team. The agile principles and applications are applied to meet the customer requirements by successful completion of the project.
21. State some major principles of Agile testing.
Answer: Some major principles of Agile testing are –
- Customer satisfaction
- Face to face communication
- Sustainable development
- Quick respond to changes
- Continuous feedback
- Successive improvement
- Self-organized
- Focus on essence
- Error-free clean node
- Collective work
22. What are the skills of a good Agile Tester?
Answer: An agile tester is one who implements agile software development principles for software testing. Followings are the skills of a good agile tester –
- Required to be familiar with the concepts and principles of Agile
- Should have an excellent communication to communicate with the team and the clients
- Ability to set priority for the tasks according to the requirements
- Should be able to understand the requirements properly
- Understanding of the risks involved with a project due to changing requirements
Advanced Agile Scrum Interview Questions
The agile scrum is a vast field, so the interviewers seek candidates with advanced knowledge. Thus, the basic knowledge is not sufficient to crack the job interview. So, here we bring some frequently asked advanced agile scrum interview questions.
23. What do you understand by the term “Scrum of Scrums”?
Answer: This is one of the commonly asked scrum master interview questions. Consider a case to understand the meaning of the term scrum of the scrums. Let us assume an active project on which seven teams are currently working. The number of members of each team is also seven. Each team is responsible to lead its own scrum meeting. But, in order to coordinate and communicate with different teams, it is required to organize a separate scrum meeting. The scrum meeting organized to hold a coordination between scrum teams is known as the scrum of scrums. There is one team leader from every team, known as ambassador, who is responsible to represent his team in the scrum of scrums.
24. Scrum is an Agile framework, right? Name a few other Agile frameworks.
Answer: Yes, Scrum is an Agile framework. Few other Agile frameworks are –
- Feature Driven Development
- Test Driven Development
- Kanban
While answering this type of Agile Scrum interview questions please note that name the frameworks you are familiar with or have followed.
Don’t you still know the importance of learning Scrum for software developers? Read the article why should software developers learn Scrum.
25. Explain some common metrics for Agile.
Answer: You may definitely come across agile scrum interview questions regarding agile metrics. The question may be related to a particular agile matric or explaining all the metrics. So, the detailed description of some common metrics for Agile is as follows:
Velocity – Velocity is the average number of points from last 3-4 sprints. It is measured by the summation of the all approved estimates of the stories. It gives an idea of the capacity, progress etc.
Cumulative Flow Diagram – With the help of a cumulative flow diagram, an inspection is done over the uniform workflow. In this diagram/graph, the x-axis represents time whereas the y-axis represents the number of efforts.
Work Category Allocation – Work category allocation is an important factor that gives a quick information of the time investment i.e. where the time is being invested and which task should be given priority as a factor of time.
Time Coverage – It is the time that is given to a code during testing. It is calculated in percentage as a factor of the number of lines of code called by the test suite and the total number of relative lines of code.
Business Value Delivered – It is a term which denotes the working efficiency of the team. The business objectives are assigned numerical values 1,2,3.. and so on, as per the level of priority, complexity, and ROI.
Defect Removal Awareness – It is the factor that helps the team to deliver a quality product. The identification of an active number of defects, their awareness, and removal plays an important role in delivering a high-quality product.
Defect Resolution Time – It is a procedure through which the team members detect the defects (bugs) and set a priority for the defect resolution. The procedure of fixing errors/bugs or defect resolution comprises of multiple processes such as clearing the picture of defect, schedule defect fixation, completing defect fixation, generation, and handling of resolution report.
Sprint Burn Down Matric – The sprint burndown chart is a graph to represent the number of non-implemented or implemented sprints during as Scrum cycle. This matric helps to track the work completed with the sprint.
26. Is it ever suggested to use waterfall over Scrum? If yes, explain when.
Yes, sometimes it is suggested to use a waterfall model over Scrum. It is done when the customer requirements are simple, well-defined, fully understood, predictable, and are not subjected to change until the completion of the project. It may the case that you would haven’t ever used waterfall over Scrum but you need to prepare for such Agile Scrum interview questions.
27. Why does Scrum encourage the use of automated testing for projects?
Answer: Scrum encourages the use of automated (automated performance or automated regression) testing to make the fastest possible delivery of the project. While answering this question, you may explain some tools that you have used for automated testing.
Confused about which Scrum Master Certification you should go for? Have a comparison between PSM Vs CSM and get to know which one is the right certification for you!
28. What do you know about “Planning Poker” technique?
Answer: Planning poker, also known as Scrum Poker, is a card-based agile technique that is used for planning and estimation. To start a session of planning poker technique, the agile user story is read by the product owner. The steps performed in the poker planning technique are –
- Each estimator has a deck of poker cards with the values such as 0, 1, 2, 3, 5, and so on, to denote story points, ideal days or something else that the team uses for estimation.
- Each estimator has a discussion with the product owner and then privately selects a card on the basis of their independent estimation.
- If the cards with same value are selected by all estimators, it is considered as an estimate. If not, the estimator discusses the high and low value of their estimates.
- Then again, each estimator privately selects a card and reveals. This process of poker planning is repeated to reach a general agreement.
Experience-based Agile Scrum Interview Questions
In this section, the questions will be related to the experience you have in agile or scrum. You should be prepared with the data of few of your old projects when answering these experience-based agile scrum interview questions.
29. Name some methodologies and development where you have used the Agile model.
Answer: While answering this type of agile scrum interview questions, keep in mind to mention those methodologies that are familiar with. Some of the methodologies and development where the Agile model can be used are –
- Crystal methodologies
- Lean software development
- Dynamic development
- Feature-driven development
30. Share your experience as a Scrum Master/Product Owner/Agile team member and what were your primary responsibilities?
Answer: Here you have to explain your project details where you worked in Scrum team and defining your role with the responsibilities you held. The trick in this question is whether while explaining you are showing self-organizing and self-motivational team. Also, the interviewer will try to judge how in depth you have worked in the agile/scrum environment based on your explanation.
31. What was the length of sprints/iterations in your project?
Answer: This is probably the most common question asked in agile interviews. The idea here is to judge in which kind of environment you have worked. There will be definitely follow up question like was this length fixed in the beginning and never changed? Have you tried with more than this length or less than that?
32. How have you done user story mapping & estimation of stories in your projects?
Answer: This question is to under how you have done story writing, mapping, and estimation. Have you used any estimation technique like planning poker, t-shirt, sizing etc? Whatever technique you used in your project just mention it very clearly.
33. What is the biggest challenge you faced in your project while handling the Scrum team members?
Answer: This question is pure to judge your experience. The better you articulate your challenges working in agile better it will be. Challenges generally faced in the initial stages of scrum is stabilizing the velocity, team members conflicts, sticking to time-boxing etc..
34. Have you ever performed the removal of impediments as a scrum master on behalf of scrum team?
Answer: As the scrum master acts as a coach for his team, he should motivate his team to perform every task. Although he can remove impediments on behalf of scrum team but he should not do this. It is recommended for a scrum master not to over pamper nor overrule the team. There may be something when the team can face failure, at that time the scrum master should help them. He should guide them with an appropriate method t0 get out of the problem. Scrum master should prompt his team members to become independent enough to face problems and take a decision by themselves. This is one of the frequently asked scrum master interview questions, so prepare now and get ready to answer.
35. Differentiate between MVP and MMR.
A Lean Startup idea known as the Minimum Viable Product (MVP) emphasises the importance of learning as a product is being developed. By exposing target customers and users to the original version, it enables the idea to be evaluated and understood. To achieve this, one needs first gather all pertinent data and then draw conclusions from it. The idea behind the MVP is to develop a product, distribute it to customers, and then observe how the product is used, viewed, and understood. Additionally, it will help you clearly comprehend the requirements of your consumers or clients.
Comparative Agile Scrum Interview Questions
Whatever is the field of job, interviewers prefer to ask one or more comparative or difference-based questions. The questions may be from the currently used or previously used technologies. So, here we represent some comparative agile scrum interview questions.
35. What is the difference between the agile & traditional way of working?
Answer: This question is to judge whether one is aware of the environment of the agile way of working. Here the answer is expected to cover few or all of below:
- The traditional way is sequential where design->Development->Testing etc. happens one after another whereas in agile all of this is done in every iteration/sprint
- Changes are welcomed in agile as Scope is flexible whereas in traditional manner scope is fixed in the beginning due to which changes have to follow change request path
- Progress is measured with % completion traditionally whereas working software is the measure of progress in agile
- Project Manager as a central controlling authority is traditionally driving the project whereas Self-motivated and self-organizing teams drive the projects in agile
36. What is the difference between Sprint Planning Meeting and Sprint Retrospective Meeting?
Answer: The difference between Sprint Planning Meeting and Sprint Retrospective Meeting is as follows:
Sprint Planning Meeting – A meeting in which all the Scrum roles (product owner, scrum team, and scrum master) have a discussion about the team’s priority features and product backlog items is known as sprint planning meeting. This meeting is held every week and lasts for almost 1 hour.
Sprint Retrospective Meeting – A meeting in which all the Scrum roles (product owner, scrum team, and scrum master) have a discussion about the good part of the sprint, the bad part of the sprint, and the sprint improvements is known as sprint retrospective meeting. This meeting that is held at the sprint review meeting or at the end of the sprint; it lasts for 2-3 hours.
This is one of the frequently asked Agile Scrum interview questions. You may be asked to define the above terms separately or the difference between these two.
37. How is an agile testing methodology different from other testing methodologies?
Answer: Agile scrum interview questions may include a number of questions from agile testing. Let’s understand how you can answer such questions.
The agile testing methodology involves the division of the whole testing process into multiple small segments of codes. In every step, these segments of codes undergo testing. There are a number of additional processes involved in agile testing methodologies such as team communication, strategic modifications for optimal results and many others.
38. What is the difference between agile & scrum?
Answer: This question will test whether you are aware of a broader picture of agile and its different frameworks or flavors. Below image will help you explain this answer where you can say agile is an umbrella of values and principles and under it, one of the lightweight frameworks is called Scrum.
Certification-related Agile Scrum Interview Questions
Certifications have become very important these days. Although it’s not compulsory to have a certification for any job position it demonstrates your skills to the employers. So, interviewers include these certification-related agile scrum interview questions in an agile scrum interview.
39. Do you have a Scrum Master certification?
This question may seem awkward to you but it is one of the most popular Agile Scrum interview questions. If an interviewer asks this question, it doesn’t mean that a certification is must for the job position. Just be confident while answering whether you have a scrum master certification or not. If you are a certified scrum master, just share the details of your certification like certification exam, score obtained, and the year of passing the certification exam. In case you don’t have a certification, mention and highlight your experience in the particular field. Also, let the interviewer know if you are planning to invest in the certification in the near future.
Here’s the complete preparation guide for: PSM I Certification | PSM II Certification | PSM III Certification
40. Do you hold any agile certification? Why did you choose this certification?
Answer: Agile and scrum certifications are hot in the market and organizations are expecting the candidates to hold one or more out of it. Certifications generally looked by organizations are:
- ACP (Agile Certified Practitioner)
- ASM (Agile Scrum Master)
- CSM (Certified Scrum Master)
- PSM (Professional Scrum Master)
- Safe Agilist
If you have any of these certifications, showcase it here in a big manner. Due to the many options available in the market, organizations also have started asking why you have chosen one. It’s recommended that for your certification you know few good points as its advantages handy with you so that it can be mentioned once asked.
41. What is test-driven development?
Test-driven development (TDD) is a software development process that relies on the repetition of a very short development cycle: first the developer writes a failing automated test case that defines a desired improvement or new function, then produces the minimum amount of code to pass that test, and finally refactors the new code to acceptable standards.
The process of TDD can be summarized as “red-green-refactor”: first a test is written that will fail (red), then code is written to pass that test (green), and finally the code is refactored to meet acceptable standards (refactor).
TDD is intended to make code simpler and easier to maintain by ensuring that functionality is added only when it is strictly necessary, and that code is kept clean and free of duplication.
TDD is not a replacement for manual testing, but it can help reduce the amount of manual testing that is necessary. TDD is also not a replacement for design; the design of the code should be done before any tests are written.
42. What do you mean by release candidate?
A release candidate is a version of a software application that is ready for release, but has not yet been approved by the powers that be. In order to become a release candidate, a software application must go through a rigorous testing process to ensure that it meets all the necessary criteria for release.
The term “release candidate” is often used in the software development world, but it can also be applied to other areas, such as product development. In agile and Scrum, a release candidate is usually the last step before a product is officially released.
Also Read: Top 5 Agile Certifications
Some Other Important Agile Interview Questions Suggested By Our Readers:
1. When can you say your story is ready to develop/groom enough to deliver?
Answer: Ready is a stable state of Scrum that is linked to a user story. As per the Definition of Ready (DoR), a user story have to satisfy some conditions before picking it up for a sprint i.e. to be in the ready state. So, the conditions that are essential for the development/grooming of a user story specify if the user story is ready to develop/groom enough to deliver or not.
Basically, the following questions should be answered to consider a user story ready:
Why: Is it clear what the business or stakeholders are trying to achieve?
What: Is the goal or outcome of the user story clear?
How: Is the strategy for the implementation of user story clear? Is the story is small enough?
The conditions for the user story are defined by scrum master in coordination with the product owner. Although the conditions vary for the different projects, some of the common conditions for user story are –
- It is clear and well-written in a format to identify user type, function, and benefits
- It is self-contained i.e. independent of other user story inherently
- It is small so that can be delivered in a single sprint
- It has a defined acceptance criteria for all the functional requirements and appropriate non-functional requirements
- It should have been estimated by the scrum team
- All the external blocking dependencies should have been resolved before starting the sprint
- The resources/team have all the skills required to deliver the sprint
So, if the user story can give satisfactory answers to the above questions and meet the conditions defined, it is considered to be ready.
2. How do you manage if the story is high priority and resources left before last day of sprint completion?
Answer: The answer to this question will fully depend on the number of resources left.
If one or two members leave the story just before a day of the sprint completion, a scrum master can handle the situation as described below –
First, analyze the pending tasks and the impact on the overall sprint. According to that, try to find an alternative solution around to manage the situation. As a leader, you can decide to work for some extra hours to complete the sprint and can also ask (remember to ask, not to tell) other team members to do so. And this way, you can do the sprint completion on time.
In case, more or all the members leave just before a day of the sprint completion, then the situation can be handled as –
Analyze the amount of pending work and its impact on the overall sprint.
Check if you can manage the situation and finish the task by yourself or try to get some other resources to work. (Although this won’t be feasible as you will have to first explain everything about the sprint and task done to the new team; of course it won’t be possible in a day.) So, if you can’t manage to complete the sprint by yourself, it’s better to tell this to your product owner. You can ask him to give some more time to complete the sprint, so you can get a new team or get it done by yourself by working extra hours.
3. As a scrum project manager, what are your responsibilities?
Answer: Firstly, I would like to correct the question as there is no project manager role in scrum i.e. Scrum Project Manager is not a defined role. The responsibilities of a project manager are split between the scrum master, product owner, and the development team.
Scrum Master is a facilitator who is responsible to manage the development teams working on Agile methodology. He is an intermediate between the product owner and the development team to work for the achievement of the final goal. The scrum master role is similar to the project manager in a few cases, and the responsibilities of a scrum master are:
- Performing Sprint planning
- To schedule the daily Scrum meeting
- Management of responsibilities of the Scrum process
- Assisting Scrum teams to follow Scrum practices
- Work to remove barriers to allow the team focus on work
- Providing assistance with the Product Backlog
- Co-ordinating with Product Owner to design Product Backlog items for the upcoming Sprint
- Motivating team not to be distracted by the external factors
- Helping team to improve the dynamics to reach the goal
Good books also help you to enhance your knowledge and prepare for an interview. Go through the list of Best Agile Books that will help you get ahead in your career.
4. How (What are the parameters) to choose the number of resources required to your scrum team?
Answer: The team members are the resources to build a scrum team. And the scrum guide recommends that the development team size should be between 3 and 9 (7 +/- 2) without giving any context or reasons for this.
Obviously, one common range can’t define the optimal size of the team for everyone. So, there are some factors that should be considered while determining the number of resources required to form a scrum team. These are not just the factors but the need for the development of the scrum team, let’s have a look.
- The broad set of skills required to build the team
- The consistency in team membership for a long period of time
- Dedication of team members to one and only one team
- Diversity and variety in thought and background I.e. a broad set of ideas and experience for more creativity
The scrum guide also states the issues faced by the teams with over 9 members in terms of concerns instead of failing points. However, you can even have 15 members in the scrum team.
In that case, two teams will be formed according to the nexus Guide for scaling Scrum.
But having a larger team won’t be that effective. In that case, there will be no room for error as going off the tangent will affect large team more. Remember that the events depend on sprint length, not on the team size. So, just follow scrum guide along with the consideration of some factors while determining team size.
5. What is the product backlog?
Answer: The product backlog is a prioritized list of features that are to be developed. It is the responsibility of the product owner to maintain the product backlog.
6. What are the benefits of using Scrum?
Answer: Scrum can help organizations improve communication and collaboration, promote continuous improvement, and increase transparency and accountability.
7. What is a burndown chart?
Answer: A burndown chart is a graphical representation of the amount of work remaining in a sprint. It is used to track the progress of the sprint and identify any potential problems.
Final Words
Agile and Scrum methodologies are used to complete a project at earliest. Implementing agile principles results in customer satisfaction whereas scrum is known for its flexible feature as per the requirements.
Here, in this article, we have listed top frequently asked Agile Scrum interview questions. This set of most popular Agile scrum interview questions and answers will surely boost your knowledge of Agile and Scrum concepts and will help you to crack the interview, however, becoming a certified agile professional widens your opportunity.
Have you any question related to Agile Scrum? Please share your comment below or ask here, we will be happy to answer.
Good Luck!!
- Top 20 Questions To Prepare For Certified Kubernetes Administrator Exam - August 16, 2024
- 10 AWS Services to Master for the AWS Developer Associate Exam - August 14, 2024
- Exam Tips for AWS Machine Learning Specialty Certification - August 7, 2024
- Best 15+ AWS Developer Associate hands-on labs in 2024 - July 24, 2024
- Containers vs Virtual Machines: Differences You Should Know - June 24, 2024
- Databricks Launched World’s Most Capable Large Language Model (LLM) - April 26, 2024
- What are the storage options available in Microsoft Azure? - March 14, 2024
- User’s Guide to Getting Started with Google Kubernetes Engine - March 1, 2024
fantastic points altogether, you simply gained a new reader. What would you suggest about your post that you made a few days ago? Any positive?
Nice… well written..
These are truly helpful for those preparing for the SM interviews.
Very realistic questions; must read
Thank You Shriharsha.
amazing questions and especially the explanations or clear and concise.
Thank you Arun!
Hey Amit – An excellent list indeed. I really felt a lot learned about the Agile after reading these questions. Thanks, Buddy for such an eternal write-up!!!
I am sure you mean “scrum metrics” and not matrices 🙂
Great work !
Hello,
Can anyone add these questions with answers. I face these many of my interview.
1. when can you say your story is ready to develop / groom enough to deliver
2. how do you manage if story is high priority and resources left before last day of sprint completion
3. As a scrum project manager what are the responsibility
4. how( ehat is the parameters) to choose the number of resources required to your scrum team
Hi Sam,
Thank you for sharing Interview Experience with Us. Sure, I will add these questions with detailed answers.
Thank you!
Hi Sam,
All 4 questions are added here.
Regards,
Amit Verma
@Sam
/*1. when can you say your story is ready to develop / groom enough to deliver*/
Typically scrum team should have DoD – Definition of Done which answers this question.
In general a story is ready to develop when
– it is clearly understood by team (ex: mockup is available for the GUI feature).
– team has estimated the story.
– PO has prioritised the story.
/*2. how do you manage if story is high priority and resources left before last day of sprint completion*/
The main responsibility of Scrum Master is to enable team to become self organized and cross functional team.
In such case a story can and will be handled by more than one person.
Otherwise, be transparent to all stakeholders that the story cannot be completed. Discuss such risk in retrospective meeting and adapt soultions so that it won’t repeat.
/*3. As a scrum project manager what are the responsibility*/
Typically scrum do not need manager. However, project need manager. Hence, it is only project manager. His/Her responsibility remains same as in any other setup.
For example, project manager still responsible to ensure project has sufficient staff and resource.
/*4. how( ehat is the parameters) to choose the number of resources required to your scrum team*/
If your meaning of resources is team members, then answer is less than 10.
However, project/solution may need more than one scrum team. That depends on projects need.
Scrum team size is better be less than or equal to 9, because larger the team more complex the communication among team members. In agile effective communication is key to success.
An excellent blog..!! I read a lot of interesting posts here. I really felt a lot learned about the article that you have posted. Thanks, Buddy for such write-up!!!
Hey Amit, Thanks a ton, excellently put in very simple and precise words…Thanks a lot again.
Thank you Prakash!
Don’t miss the chance to get better at Scrum Interview.
Nice Question n Answers…
But I have some questions also and please let me know what will be there answers :
1.What is regression suite in Agile?
2.Impact Analysis with its template in Agile ?
3.Acceptance Test Plan in Agile with template.
4.Test Estimation in Agile
5.Who write User story.
6.Points in User stories
7.If the user story is not developed and deployed on defined date to client.
8.How do you manage if n number of sprint is deployed.
And real time scenarios question with respect to Agile.
@Anuj
5. Who write user story?
In classical scrum practice it is product owner (PO).
However, it is not always practical for PO to write user story.
Few technical stories is normally written by architect or senior developer.
In my opinion any team member should be allowed to create a user story.
However, approval and prioritization of user story should come from PO.
6. Points in user stories.
(I think you need to know what do points of user story represent ? Is it 1 point = 1 day or 2day or 1 week?)
Story points do NOT represent time.
1 point is a representation of effort of typical reference task that team has agreed as reference in the beginning.
However, it is usually not easy to understand the above concept, hence some scrum master align (reference) one story point = x hours or day.
There is nothing wrong in having any reference for a story point. But it will HORRIBLE wrong if you start using the velocity to compare two teams.
NEVER Ever compare two scrum teams based on velocity. Typically management wants to do that comparison, as a scrum master you should ensure that is avoided. It is scrum master responsibility to enlighten management about pit falls of such comparisons.
Good question set and descriptive answers overall.
Thank you!
Thank you!
Very informative Q and A and would love to add few more topics and questions further.
Hello Amit,
Can you answer these questions immediately. I face these questions in many of my interview.
1. How do you get requirements?
2. How do you do test estimation in agile?
Thanks
Kiran V
Very Good explaination
Hi Amit,
Very nicely written.
Will you please add some real time scenarios and corresponding probable solutions? for e.g. Team is not motivated/working, how to motivate them?
In half stage of sprint, only 3 point delivered compared to total commitment of 10 SP in weeks. What would scrum master do then?
Impediment not resolving on time, what to do then as Scrum Master?
You can add few more scenarios like this and probable solutions
@Sam
/*1. when can you say your story is ready to develop / groom enough to deliver*/
Typically scrum team should have DoD – Definition of Done which answers this question.
In general a story is ready to develop when
– it is clearly understood by team (ex: mockup is available for the GUI feature).
– team has estimated the story.
– PO has prioritised the story.
/*2. how do you manage if story is high priority and resources left before last day of sprint completion*/
The main responsibility of Scrum Master is to enable team to become self organized and cross functional team.
In such case a story can and will be handled by more than one person.
Otherwise, be transparent to all stakeholders that the story cannot be completed. Discuss such risk in retrospective meeting and adapt soultions so that it won’t repeat.
/*3. As a scrum project manager what are the responsibility*/
Typically scrum do not need manager. However, project need manager. Hence, it is only project manager. His/Her responsibility remains same as in any other setup.
For example, project manager still responsible to ensure project has sufficient staff and resource.
/*4. how( ehat is the parameters) to choose the number of resources required to your scrum team*/
If your meaning of resources is team members, then answer is less than 10.
However, project/solution may need more than one scrum team. That depends on projects need.
Scrum team size is better be less than or equal to 9, because larger the team more complex the communication among team members. In agile effective communication is key to success.
amazing information sir for beginners
Question – If I would need to change something in scrum process then what that could be ?
Thank you so much , this is very usefull
So much information in one page..it almost covered the topic..very crisp answers ..Thank you so much for posting this..waiting for more information on advance scrum.
Great job in compiling the basics of Agile and Scrum! Found it pretty useful to brush up!
Great post! First of all, i want to thanks to this site,its really a amazing place where anyone can enhance his/her knowledge related to Integration testing. Each answer were explained very clearly. It’s easy to understand for me. keep up the immense work!
I have never come across a piece of well-packed information on scrum such as this, thank you for your help.
I’m not sure I see the point in asking purely theoretical questions with no examples of practical real-world problems. Most interviewers do the opposite. They ask few or no theoretical questions, and focus mainly on practical problems and scenario-based questions to evaluate knowledge.
well written.. all the real life question and practical answer
Wonderful information sir for beginners sir .You have given great information in single page and as almost covered the topic..very crisp answers ..Thank you so much for posting this..waiting for more information. Keep posting.
Really useful .. and got to know more about Agile
Generally, I do not comment on the blog post, but I love this post and credit goes to the writer: Neeru Jain, thanks for sharing this.
Really an interesting blog I have gone through. There are excellent details you posted here. Sometime it is not so easy to design and develop a Agile Methodology for improve productivity without custom knowledge; here you need proper development skill and experience. However the details you mention here would be very much helpful for the beginner.
Thank you for the great information about agile. It is very useful and informative.
Greetings! Very helpful advice in this particular post! It is the little changes which will make the greatest changes. Thanks for sharing!
You’re so awesome! I do not believe I have read through something like this before. So good to discover someone with original thoughts on this subject matter. Seriously.. thank you for starting this up. This web site is one thing that is required on the web, someone with a little originality!
You need to be a part of a contest for one of the highest quality websites on the net. I’m going to highly recommend this site!
May I simply say what a relief to uncover an individual who genuinely knows what they are talking about over the internet. You actually realize how to bring a problem to light and make it important. A lot more people have to look at this and understand this side of the story. I can’t believe you aren’t more popular since you surely have the gift.
Nice blog here! Also your website loads up very fast! What web host are you using?Can I get your affiliate link to your host?I wish my website loaded up as fast as yours
My partner and I stumbled over here from a different website and thought I should check things out. I like what I see so i am just following you. Look forward to finding out about your web page yet again.
Best view i have ever seen !
Very interesting information!Perfect just what I was looking for!
Thanks, exactly what is needed.
This is actually the kind of information i have been trying to find.
Best regards.
Thank you for sharing these important interview questions and answers. Really helpful.
It’s Really useful.I konw about the details about Agile Model.
You completed certain good points there. I did searching on the subject matter and found most persons will go together with your blog
I was suggested this blog by way of my cousin. I’m now not certain whether or not this submit is written through him as nobody else realize such distinctive approximately my trouble. You’re wonderful! Thank you!
Thanks , the list of questions are really worth .I am new to Agile and still a lot to go.
thank you for giving a piece of great information about starting a new blog.
There are several posts available near this, I do think taking there reference could experience made this spot or article really informative. That’s not me expression this post is poor quality. Simply Need to pronounce the fact that info provided here was unique, merely rebuild more very near to complete, supporting to former information get been actually good. The points you get touched here’s important, thus I’m going to spot several of the information here to produce this actually beneficial to entirely the newbie’s here. Many thanks for this data. Actually helpful!
Your blog provided us beneficial information to work on. You have done a outstanding job!
thank you for all free unfo really great article .
This is the Insightful information to be implemented in our professional life to become an Agile Scrum Master. Would like to know more about the advantages of being an Agile Scrum Master. Keep sharing thanks.
Your blog is really so informative. Thank you for sharing it with us.
Thanks, exactly what is needed. Very useful interview questions and answers for all interviewers.
A very excellent blog post.
Thanks for nice article
This is very comprehensive, thanks so much.